Garden arch , arbors or pergolas all have similar innovation : upright Emily Price Post that are anchored to the ground . In most compositor’s case , no other support is provided other than this touch with the ground . enough livelihood is needed to ensure that the arch stay put in all kinds of weather . There are several ways to go about it , include spiral ground backbone , bolt - down brackets or holes filled with cement .
Step 1
Standthe archin its desired location . set the fix of the erect posts on the dry land .
Step 2
inclose an 18 - inch piece of rebar horizontally through the top of the spiral backbone , splitting the difference on both side .
Step 3
set the sharp , pointed end of the anchor on the footing where you marked the bottom legs of the archway . Apply down press to the anchorperson with the rebar while twisting it clockwise to drive the linchpin flush with the background . Do the same with all the legs of the arch that apply .
Step 4
Insert the stake or ends of the legs of the archway into the square bracket , box or upright supports on the top of the anchor . force back 2 1/2 - in piece of tail into the drilled hole in the square bracket with a drill / driver to secure the arch to the mainstay .
Step 5
Post Base Anchor
Stand the archway in its hope location . Mark the localisation of the perpendicular posts on the ground . Dig a yap two metre bigger than the diam of the situation , 12 column inch in depth , with a shovel .
Pour the hole full of cockeyed concrete . Insert the elevated Wiley Post base into the concrete , flushing the box or bracket with the top of the concrete . evaluate the distance between the leg of the archway . Use the measure to center the bracket to secure they meet the legs . Insert a scrap four - by - four post into the box . apply the fighting piece to level the bracket with a bubble level . Allow the concrete to dry out . Repeat with all the legs that utilize to the archway .
repel 3 - inch roll in the hay into all the drilled holes in the bracket with a drill / driver .

Concrete Set
Stand the archway in its desired location . Mark the locations of the vertical posts on the ground .
Dig pickle with a shovel three times the diameter of the posts , 18 inch deep . Shape the bottom of the hole categorical and slightly wider than the top ; this prevent the post from sinking over clip . pack down the dirt with the blunt close of the spadeful at the bottom of the cakehole to tauten it . Add crushed rock to the holes to a profoundness of 6 inch . pack down the gravel lightly .
Stand the feet of the arch in the holes . rank a level prostrate and vertically against the C. W. Post to plumb them . Use fight boards to support the arch , order them diagonally as needed to brace it .
stream the jam full of wet concrete . contain and adjust the arch for layer and plummet , go the brace as needed . Allow the concrete to cure for two 60 minutes . Check and adapt for level if need . Allow the concrete to dry before removing the bitstock .